کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4925855 1431412 2016 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Emergency operating procedures improvement based on the lesson learned from the Fukushima Daiichi accident
چکیده انگلیسی
One of the lessons learned from the Fukushima Daiichi accident is the emergency operating procedures (EOPs) have to be improved. The BWR Owners' Group revised the emergency procedure guidelines and addressed the lesson learned from the Fukushima Daiichi accident in revision 3 in order to avoid loss of turbine-driven makeup water systems during reactor depressurization. However, the improvement deserves much more attention. The existing EOPs at the time of the accident may not be adequate enough for the prolonged station blackout condition, because resources required for performing the EOPs are vastly unavailable or gradually exhausted. The improved EOPs must not only permit early reactor pressure vessel depressurization, but also address the risk accompanied with the emergency depressurization. For this reason, Taiwan Power Company proposed the Ultimate Response Guideline (URG) to cope with Fukushima-like accidents. The main content of the URG is a two-stage depressurization strategy, namely the controlled depressurization and the emergency depressurization. The technical basis of the two-stage depressurization strategy was discussed in this paper. The effectiveness of the URG was verified by using TRAC/RELAP Advanced Computational Engine (TRACE). Besides, the emergency responses performed by Fukushima Daini nuclear power plant (Fukushima Daini NPP) were found to be very similar to the URG. The consequences of Fukushima Daini NPP somehow demonstrate that the URG is effective for Fukushima-like situation. Effective strategies for coping with Fukushima-like accidents are worthwhile to be integrated into the improved EOPs. The Fukushima Daiichi accident might have been prevented if the improved EOPs had been used, even with the existing design of Fukushima Daiichi NPP at the time of the accident.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 309, 1 December 2016, Pages 53-64
نویسندگان
, ,