کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5030134 1470670 2016 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Bridge Across the River Vah's Reservoir Hricov and Over the Road I/18, Motorway D3 in km 7.500
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی (عمومی)
پیش نمایش صفحه اول مقاله
Bridge Across the River Vah's Reservoir Hricov and Over the Road I/18, Motorway D3 in km 7.500
چکیده انگلیسی

This bridge structure is designed as twin bridge of total length 1.40km, the structure has only two expansion joints in its length. Each bridge structure is designed as precast concrete girder with 29 and 30 spans.Three methods of casting were designed for this project, symmetrical cantilevers (part 3); stationary (part 1) and movable scaffolding system (part 2 and 4). The cross section of part 1,2 and 4 is double “T” beam, part 3 is box girder. Because of shortage of time all parts of structure had to be built together. Construction of the bridge has started in December 2014, the main prestressed concrete superstructure should be finished until December 2016 and all remaining works should be finalized in 2017.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia Engineering - Volume 156, 2016, Pages 91-96
نویسندگان
, , ,