کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5099279 1376997 2007 21 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A theory of optimal deadlines
موضوعات مرتبط
مهندسی و علوم پایه ریاضیات کنترل و بهینه سازی
پیش نمایش صفحه اول مقاله
A theory of optimal deadlines
چکیده انگلیسی
This paper sets forth a model of contracting for delivery in an environment with time to build and adverse selection. The optimal contract is derived and characterized and it takes the form of a deadline contract. Such a contract stipulates a deadline for delivery for each possible type of agent efficiency. The optimal contract induces inefficient delay by using delivery time as a screening device. Furthermore, rents are increasing in the agent's efficiency. In meeting the deadline, the agent's effort is strictly increasing over time, due to discounting. It is shown that increasing the project's gross value decreases optimal delivery time, while increasing the scale or difficulty of the project increases it. Last, it is shown that the agent's rents are increasing in both project difficulty and gross project value.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Economic Dynamics and Control - Volume 31, Issue 2, February 2007, Pages 493-513
نویسندگان
,