کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5127492 1489056 2017 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
An integrated production-inventory model with defective item dependent stochastic credit period
ترجمه فارسی عنوان
یک مدل موجودی تولیدی یکپارچه با دوره اعتبار تصادفی وابسته به محصول معیوب
کلمات کلیدی
فهرست، مدیریت زنجیره تامین، دوره اعتبار تصادفی، نسبت معیوب، تقاضای زمان انتظار تصادفی،
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
چکیده انگلیسی


- An integrated production inventory model for defective item with stochastic credit period has been studied.
- Manufacturer's offered credit period depends on the defective ratio of the item.
- Defective ratio of the item is assumed to be random which follows beta distribution of first kind.
- The lead time demand is also assumed to be random follows normal distribution.
- Solution procedures and numerical examples for three cases are performed. Sensitivity analysis has been carried out.

In this paper an integrated production-inventory model has been developed for a defective item in a business of a buyer and a manufacturer. After production the manufacturer sells the packed products of the item to the buyer in some lots and then the buyer sells these products to the customer after checking them. There have chances to get the defectiveness of the products. So in this paper, it has been considered that the defective ratio of the item is random to be assumed as follows a beta distribution of first type. To compensate the losses due to defectiveness, the manufacturer offers a defective ratio dependent stochastic credit period to the buyer. Here also the lead time demand has been considered as a normal distribution and the lead time is composed of the cycle period and fixed delay time due to machinery set-up, waiting, transportation, etc. The integrated profit functions have been formulated for three cases which are illustrated numerically and solved by some proposed solution procedures. Finally a sensitivity analysis has been carried out with respect to some parameters.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 110, August 2017, Pages 255-263
نویسندگان
, , ,