کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5127712 1489061 2017 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem
چکیده انگلیسی


- Discrete version of Cuckoo Optimization Algorithm (DCOA) and its improved version called IDCOA are proposed.
- Lower bound (LB) and some simple dispatching rules are developed.
- IDCOA outperforms the proposed approaches for this problem and the LB is fairly tight.

The three-stage assembly flow shop scheduling problem, where the first stage has parallel machines and the second and the third stages have a single machine, is addressed in this study. Each product has made of several components that after processing at the first stage are collected and transferred to the third stage to assemble them as the product. The goal is to find products' sequence to minimize completion time of the last product, makespan. Since the problem is NP-hard, an improved version of Cuckoo Optimization Algorithm (COA), a bio-inspired meta-heuristic, is proposed which incorporates new adjustments such as clustering, egg laying and immigration of the cuckoos based on a discrete representation scheme. These novel features result in an Improved Discrete version of COA, called IDCOA, which works efficiently. Also, for the addressed problem, a lower bound and some dispatching rules are proposed. The performance of the employed algorithms through randomly generated instances is evaluated which endorses the capability of the proposed IDCOA algorithm.

98

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 105, March 2017, Pages 158-173
نویسندگان
, , , ,