کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5475038 1521087 2017 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Performance verification of Passive Accident Mitigation Scheme (PAMS) under feedwater line break (FLB) accident
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Performance verification of Passive Accident Mitigation Scheme (PAMS) under feedwater line break (FLB) accident
چکیده انگلیسی
Shi et al. (2015) analyzed the PAMS operation characteristics under Station Blackout (SBO) accident using RELAP5. In order to assess the ability of PAMS, more analyses should be carried out. This paper takes the Westinghouse-designed Advanced Passive PWR (AP1000) as research object and proposes the simulation performance verification of PAMS under FLB accident with the help of RELAP5. Moreover, the comparative analysis is also conducted between PAMS and traditional secondary circuit PRHRS with different design capacities under FLB accident. Results show that: during the whole accident process, the key parameters' performances of primary system could meet acceptance criteria requirements, which proves PAMS can cope with FLB accident; moreover, since only the PAMS train connected to intact circuit can operate to mitigate FLB accident, the analysis results prove that PAMS design satisfies single failure criterion; the primary system cooling process with PAMS operation is quite close to primary system cooling process with 4% of Full Power (FP) design capacity PRHRS operation, and both of them can remove core residual heat significantly under FLB accident.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Annals of Nuclear Energy - Volume 109, November 2017, Pages 151-161
نویسندگان
, , , , ,