کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
624993 | 1455413 | 2011 | 10 صفحه PDF | دانلود رایگان |
This paper deals with the effects of equipment reliability consideration to thermoeconomic analysis of a combined power and multi stage flash water desalination plant. Exergy and thermoeconomic models of the considered process units are developed and presented in this work. An economic model of the system is developed according to the Total Revenue Requirement (TRR) method. This application can be very useful, either for the plant management in order to achieve a cost-effective operation, or for a better plant design. Equipment reliability using the state-space and the continuous Markov method is incorporated in thermoeconomic analysis to improve the cost values. The results show that the power and water costs with reliability consideration increased 4.1% and 6.4%, respectively. Additionally, the sensitivity analysis shows the relationship between the production cost and the system availability which can help the designer to decide how to improve the profit or competitiveness.
Research highlights
► We modeled the combined power and water desalination plants.
► Markov method is incorporated with thermoeconomic analysis to improve the cost values.
► The power and water costs increased with reliability consideration.
► There is a trade-off between the system availability and the cost of production.
► System availability can help to decide how to improve the profit or competitiveness.
Journal: Desalination - Volume 278, Issues 1–3, 1 September 2011, Pages 424–433