کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
626053 882864 2010 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Optimization of biological nutrient removal in a pilot plant UCT-MBR treating municipal wastewater during start-up
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی تصفیه و جداسازی
پیش نمایش صفحه اول مقاله
Optimization of biological nutrient removal in a pilot plant UCT-MBR treating municipal wastewater during start-up
چکیده انگلیسی

This study shows that an MBR pilot plant with UCT configuration is able to obtain high nutrient removal efficiency already during start-up. The biological nutrient removal (BNR) efficiencies significantly increased towards the end of the experimental run, achieving a COD removal efficiency exceeding 94% and N removal efficiency in the range of 89 to 93%. P removal efficiencies in the range of 80 to 92% have been obtained. During the experimental period (4 months) the evolution of the activity of polyphosphate-accumulating organisms, obtained from Prelease and Puptake rates, showed a small increase in the activity of polyphosphate-accumulating organisms (PAOs) and denitrifying polyphosphate-accumulating organisms (DPAOs). The specific phosphate accumulation at the end of the experimental run amounted to 8.0 mg P g− 1VSS h− 1 and 3.29 mg P g− 1VSS h− 1, for the PAOs and DPAOs respectively. Moreover, the DPAOs activity increased faster than PAOs activity, i.e. from 0.36 to 0.41 of phosphate uptake rate (PUR) ratio.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Desalination - Volume 250, Issue 2, 15 January 2010, Pages 592–597
نویسندگان
, , , , ,