کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
627382 1455470 2008 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Views on Libyan national plan (LNP) to resolve water shortage problem (WSP). Part Ib: Great Man-Made River (GMMR) project — capital cost with interest rates
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی تصفیه و جداسازی
پیش نمایش صفحه اول مقاله
Views on Libyan national plan (LNP) to resolve water shortage problem (WSP). Part Ib: Great Man-Made River (GMMR) project — capital cost with interest rates
چکیده انگلیسی

Libyan national plan (LNP) to resolve the water shortage problem will be illustrated through a quartet of a series of papers. The first series of papers (I) will deal with Great Man-Made River (GMMR) supplied from rich ground water reservoirs located in the southern desert regions. This paper (Ib) will conduct the cost analysis study by considering the influence of interest rates on capital costs, as compared to the first paper (Ia) which neglected the effect of interest rates and treated capital costs as sunk value. This will improve the ability to analyze the viability and feasibility of this mean in comparison with other means to resolve the water shortage problem.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Desalination - Volume 220, Issues 1–3, 1 March 2008, Pages 184-188