کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6744325 1429330 2017 4 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Helium neutral beam injection into ASDEX Upgrade
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Helium neutral beam injection into ASDEX Upgrade
چکیده انگلیسی
In order to prepare for AUG He plasma campaigns, serious trials to operate the AUG NBI with He began in 2014. It was found that despite the lack of high speed pumping up to two beams per injector could be operated simultaneously at reduced feed gas flow without particular restrictions on the beam-on time. For injector 1 the power per beam was limited to 550 kW at 40 keV by the required filament current in its arc sources, while for injector 2 the limitation came from the bending magnet's power supply that restricted the beam energy to 68 keV and the NBI power to 730 kW per beam. Thus the maximum available NBI heating power in He amounts to 2.6 MW for 10 s, the maximum discharge duration of AUG. Helium neutral beam injection into plasma was first tried out in 2014 for two discharges. In 2015 a dedicated He campaign used He NBI in a total of 44 discharges. As He is almost not pumped in the injectors the neutral gas flow into the torus is comparable with the total He gas puff.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 123, November 2017, Pages 281-284
نویسندگان
, , , , ,