Risks affecting the delivery of HVAC systems: Identifying and analysis
ترجمه فارسی عنوان
خطرات موثر بر تحویل سیستم های تهویه مطبوع: شناسایی و تجزیه و تحلیل
کلمات کلیدی
فعالیت های بهداشتی تحویل سیستم های تهویه مطبوع، عوامل خطرساز، پروژه های ساختمانی،
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
چکیده انگلیسی
The time and costs associated with HVAC system installation are significant percentages of the total time and cost of construction projects. Furthermore, these systems affect many of the other construction activities. They are complicated, and their installations face many risks, which may lead to time and cost overruns for the project. Therefore, more attention should be paid to how these systems are installed in construction projects. The main objective of this study was to identify the main activities associated with HVAC system installation in construction projects, as well as the risk factors that affect them. Other objectives included conducting an analysis and assessment of the effects of these risk factors on time and cost objectives. Multi-stage field surveys were used in this study. The major risk sources were qualified in terms of their severity, probability of occurrences, and impacts on time and cost objectives. Three activities associated with HVAC system installation were identified: (a) air distribution duct work, (b) chilled water distribution pipe work, and (c) HVAC equipment installation. Fifty-five risk factors that affect each specific activity and that are common to all activities were also identified and categorized into four groups. Two agreement analysis tests and a full statistical analysis were conducted. A high degree of agreement between all partners was obtained. The time and cost percentages of the three activities were determined. A detailed discussion and analysis indicated that approximately 50% of the key risks belonged to common risks that affected all activities, while the most important risky activity was chilled water distribution pipe work. Furthermore, the analysis emphasized that the number of risk factors increased as the expected duration of the activity increased; however, this relationship did not exist in the case of cost. Ultimately, the obtained results indicate that the expected time and cost overruns caused by the effects of risk factors on HVAC system delivery are approximately 10-20% and 5-10%, respectively.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Building Engineering - Volume 16, March 2018, Pages 20-30