کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
6935578 | 869076 | 2016 | 34 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Battery energy storage system for primary control reserve and energy arbitrage
ترجمه فارسی عنوان
سیستم ذخیره انرژی باتری برای ذخیره کنترل اولیه و آرایشی انرژی
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
انرژی تجدید پذیر، نسل توزیع شده، خدمات جانبی، منطق فازی، کنترل خنثی، ذخیره انرژی،
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی کامپیوتر
نرم افزارهای علوم کامپیوتر
چکیده انگلیسی
The transition to high penetration of renewable energy sources brings about problems related to the security and reliability of the electric power system. For this reason, EU countries are considering extending participation in the provision of ancillary services to distributed generators. Grid-connected Battery Energy Storage Systems (BESS) are a promising technology for enabling this transition. Besides the research efforts to regulate and integrate BESS into the existing power systems, several studies have introduced improvements in BESS control for ancillary services provision. In this paper, attention is focused on primary control reserve (PCR). An introduction to the suitability of using BESS for PCR is followed by a literature review on BESS control strategies and controller models. Then the paper presents a model to investigate methods to increase BESS potential in providing PCR. The model is based on two different operating options: (i) variable-droop, meaning the droop-control is allowed to vary in time in order to avoid state of charge saturations and guarantee PCR availability; (ii) energy arbitrage, meaning that the battery is charged and discharged when economically favourable. A 1MW/1MWh BESS was simulated in MATLAB® Â Simulink® Â by implementing the two operating options via two fuzzy logic controllers that determine the droop and the arbitrage set points. The simulations rely on real metred data inputs (i.e. frequency and electricity prices) and demonstrate that both options improve BESS operations. Specifically, a study on the Italian case was applied to evaluate the feasibility of these applications in a real life scenario.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Sustainable Energy, Grids and Networks - Volume 6, June 2016, Pages 152-165
Journal: Sustainable Energy, Grids and Networks - Volume 6, June 2016, Pages 152-165
نویسندگان
Claudio Brivio, Stefano Mandelli, Marco Merlo,