کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
7005599 1455133 2018 35 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
An MILP approach for detailed scheduling of multi-product pipeline in pressure control mode
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی تصفیه و جداسازی
پیش نمایش صفحه اول مقاله
An MILP approach for detailed scheduling of multi-product pipeline in pressure control mode
چکیده انگلیسی
Scheduling with hydraulic constraints is one of the crucial aspects to guarantee multi-product pipeline safety. This paper develops a discrete-time mixed-integer linear programming (MILP) model for a single-source multi-product pipeline in pressure control mode, minimizing the pump cost as well as the labor cost of pump stoppage/restart. Instead of limiting pressure through flowrate constraints, this paper adopts piecewise linear approximation to deal with pump characteristic curves and frictional loss associated to flowrate and establish corresponding pressure constraints. The pressure at all key points along the pipeline should be within the allowable range to ensure transport safety. In this way, the proposed model can attain the integrated optimization of the pipeline scheduling and pump scheduling, thereby avoiding the possible mismatch between pressure and flowrate obtained by two-step solving strategy. Finally, the proposed method is compared with another discrete-time MILP model (Chen et al., 2017) which sets the minimum pump rate variation as objective function for the operating economy. Two cases tested on a Chinese real-world pipeline are given to demonstrate that the optimal detailed schedules obtained by the proposed model perform better in both economy and the convenience of pump operations.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Chemical Engineering Research and Design - Volume 136, August 2018, Pages 620-637
نویسندگان
, , , , , ,