کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
703828 1460910 2013 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Optimal PMU placement for power system observability using BICA, considering measurement redundancy
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Optimal PMU placement for power system observability using BICA, considering measurement redundancy
چکیده انگلیسی


• The binary mode of ICA is introduced for solving optimal PMU placement problem.
• The multi-stage objective function is considered in order to maximize measurement redundancy.
• A new observability rule is developed.
• PMU placement problem is solved in different contingency modes.

This paper presents a new method, based on Binary Imperialistic Competition Algorithm (BICA), for optimal PMU placement in power systems. Phasor Measurement Units (PMUs) have widely been used in recent years, due to their great advantages in power systems wide area monitoring, protection and control. The purpose of this paper is to provide observability, using minimum number of PMUs, in different operating conditions. Not only the system observability is considered as main goal in this research but also maximum redundancy is taken into account. Moreover, the problem of optimal PMU placement is solved using BICA in different contingency modes such as single line outage and single PMU failure. In all investigations, the zero-injected buses are considered to obtain the best answers. In addition to the conventional rules, a new rule is developed, which is capable of reducing the number of PMUs required to make the system observable. Simulations on different test cases confirm the BICA validity in solving optimal PMU placement problem.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 103, October 2013, Pages 78–85
نویسندگان
, ,