کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
704641 1460886 2015 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Renewable power generation employed in an integrated dynamic distribution network expansion planning
ترجمه فارسی عنوان
تولید برق قابل بازیافت در یک برنامه پهنای باند توزیع پویا یکپارچه کار می کند
کلمات کلیدی
شبکه توزیع، یکپارچه سازی برنامه ریزی پویا، تولید برق قابل تجدید، عدم قطعیت، قابلیت اطمینان، شرایط عملیاتی
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
چکیده انگلیسی


• Proposing an integrated dynamic approach for DNEP.
• Employing renewable power generation as an alternative for the DDNEP.
• Regarding the reliability and operational costs in the problem.
• Possibility of islanding operation of DGs.

The recent developments in green energy technologies and the importance of using clean energies have made the renewable resources more attractive for distribution network operators, specifically due to their inexhaustible and non-polluting features. In this way, the present study initiates an integrated dynamic distribution network expansion planning (DDNEP) in which most of the planning alternatives along with renewable and non-renewable distributed generation (DG) are taken into account. The proposed framework considers the important cost terms, including both the investment and operational ones. The uncertainties regarding the intermittent nature of renewable DGs, load demand, and energy price have been well-regarded in calculating the cost components. With the aim of a precise calculation of operation and interruption costs, the load duration curve (LDC) has been established for modeling of the network loads. Moreover, both the possibility of operating the DG units in islanding mode, and, the load transferring through the reserve feeders have been interrogated in the problem in order to improve the network reliability. In the present research, to provide an accurate evaluation of reliability indices, and to cover all of the uncertainty states, the required conditions for the successful and safe operation of island have been suitably studied in the problem. In numerical evaluations, a combination of improved genetic algorithm (IGA) and optimal power flow (OPF) is employed to solve the integrated problem in the 54-bus test system. The obtained results are discussed in details.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 127, October 2015, Pages 280–296
نویسندگان
, , ,