کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
705165 891306 2012 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Steady-state operating conditions of very long EHVAC cable lines: Two case studies
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Steady-state operating conditions of very long EHVAC cable lines: Two case studies
چکیده انگلیسی

The paper deals with the operation of very long EHV AC cable lines in a well-developed bulk power system, by simulating two 400 kV–50 Hz single circuit cable lines, 80–100 km long, installed at different locations of the Italian transmission network, both standing alone and in parallel to an existing overhead line. The power transmission limits of the considered cable lines are assessed analytically, as well as the required amount of shunt compensation and its location, at line terminals or also at mid-line; a criterion for sizing mid-line shunt compensation is also proposed. In order to check theoretical analyses carried out by analytical formulas, AC load flow simulations of the transmission network with the hypothetical cable lines in place are evaluated, referring to severe loading conditions in both normal and post-contingency operation. Open-ended cable operation and shunt compensation contingencies are also addressed. Results show that power transmission limits due to cable ampacity and higher active power flows due to low cable reactance do not pose special constraints on the operation of the powerful network under examination. Appropriate shunt compensation minimizes the effects of surplus cable reactive power, allowing to operate long 400 kV–50 Hz cable lines (up to 100 km at least) with reactors at line terminals only. Moreover, if shunt compensation is installed also at mid-line, operating capabilities of the long cable lines are enhanced and losses reduced.


► Use of 400 kV–50 Hz cables, 80–100 km long, is studied for the Italian network.
► Line-end and mid-line shunt compensation is sized and evaluated.
► Steady-state operation is feasible in both peak load and no-load conditions.
► Postcontingency power flows are also compatible with cable overloads.
► Line-end shunt compensation provides satisfactory performances.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 83, Issue 1, February 2012, Pages 160–169
نویسندگان
, , , ,