کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
705568 | 891341 | 2012 | 7 صفحه PDF | دانلود رایگان |

We present a novel transmission expansion planning model that explicitly considers a multi-year planning horizon. The proposed formulation is a mixed-integer linear problem that can be solved using commercially available software. The algorithm determines the best overall transmission expansion plan, reflecting both investment and operational costs. To analyze the results obtained from the model, we use a set of efficiency metrics to appraise the effect of the expansion among generators and demands, as well as congestion metrics to measure changes in nodal prices and line congestions. This paper also provides a case study that considers the expansion plan for a transmission system based on the one of mainland Spain.
► A robust mixed-integer linear model for multi-period transmission expansion planning is proposed.
► We use physical and economic metrics to measure how nodal prices and line congestion change with the expansion.
► We introduce long-term financial investment parameters in our model.
► We develop a heuristic method to obtain a set of candidate lines and rank them according to their contribution.
► We report and analyze results from a realistic case study.
Journal: Electric Power Systems Research - Volume 82, Issue 1, January 2012, Pages 88–94