کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
705818 891365 2007 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Impact of recovered thermal energy management on the economics of operation of a grid-parallel PEM fuel cell power plant
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Impact of recovered thermal energy management on the economics of operation of a grid-parallel PEM fuel cell power plant
چکیده انگلیسی

Management of recovered thermal energy with the object of achieving optimal cost of operation of a grid-parallel PEM fuel cell power plant (FCPP) is the focus of this paper. An economic model is presented which includes the operational cost, thermal recovery, power trade with the local grid, and selling of surplus thermal energy. Multiple operational strategies are developed using this model. The strategies are then investigated by estimating the quarter-hourly generated power, and the amount of recovered thermal power while satisfying the thermal and electrical load requirements. An evolutionary programming-based technique is used to solve for the optimal operational strategy. The model is tested using different seasonal load conditions. Results are encouraging and indicate viability of the proposed model.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 77, Issue 8, June 2007, Pages 1056–1064
نویسندگان
, , , ,