کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
705891 | 1460931 | 2007 | 7 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Three utilization patterns of the renovated Moste hydro power plant on an electricity market of power and ancillary services
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
In addition to electricity, most hydro power plants can offer also the ancillary services: secondary and tertiary control reserve. On emerging electricity markets the need for these additional services is becoming more and more important, recognised and also paid. However, for each plant, there is some interdependence among those options. The same plant cannot provide maximal peaking electricity, maximal secondary control reserve as well as maximal tertiary control reserve at the same time. The generation capabilities of the plant must thus be partitioned properly among those options so as to achieve some overall goal (e.g. the maximum of revenue, etc.). This article briefly presents those options for the renovated Moste cascade on the upper Sava river near Bled in Slovenia. A small but effective mixed integer linear programme has been used.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 77, Issues 3â4, March 2007, Pages 252-258
Journal: Electric Power Systems Research - Volume 77, Issues 3â4, March 2007, Pages 252-258
نویسندگان
Zvonko Bregar,