کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
7157786 1462789 2018 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Energy, exergy, and economic evaluations of a CCHP system by using the internal combustion engines and gas turbine as prime movers
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Energy, exergy, and economic evaluations of a CCHP system by using the internal combustion engines and gas turbine as prime movers
چکیده انگلیسی
The CCHP efficiency with two prime movers increases up to 10% compared to that of a single prime mover as well as the exergy efficiency. Additionally, scenario 4 by combining the gas engine and diesel engine is selected as the best scenario. It has 87% energy efficiency, 62.8% exergy efficiency, and operating cost reduction of about 80%. Also, the payback period is 6.3 years by taking interest rate into account and 1.36 years regardless of it.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Conversion and Management - Volume 173, 1 October 2018, Pages 359-374
نویسندگان
, , ,