کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
7386870 1480637 2010 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Questioning the need for full amortization in PPP contracts for transport Infrastructure
موضوعات مرتبط
علوم انسانی و اجتماعی اقتصاد، اقتصادسنجی و امور مالی اقتصاد و اقتصادسنجی
پیش نمایش صفحه اول مقاله
Questioning the need for full amortization in PPP contracts for transport Infrastructure
چکیده انگلیسی
This may seem to increase the transaction costs for the State as more contracts (although of a similar type, especially from the second onwards) may have to be negotiated and signed. But if we take into consideration the difficulties of the frequently needed renegotiations of long duration contracts and the conditions of asymmetry of information in which the State normally finds itself in such cases, we will conclude that, besides avoiding the loss of welfare due to the poor fit of the contract after 20 years or so, this solution after all may also reduce the transaction costs associated with negotiations over the duration of the traditional contracts.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Research in Transportation Economics - Volume 30, Issue 1, 2010, Pages 139-144
نویسندگان
,