کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
7417658 1482322 2018 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Same projects, different endings-Comparative case studies on NIMBY facility construction in Beijing
موضوعات مرتبط
علوم انسانی و اجتماعی مدیریت، کسب و کار و حسابداری گردشگری، اوقات فراغت و مدیریت هتلداری
پیش نمایش صفحه اول مقاله
Same projects, different endings-Comparative case studies on NIMBY facility construction in Beijing
چکیده انگلیسی
At Asuwei and Liulitun in Beijing, two similar NIMBY facilities were proposed. Why did one incinerator survive, while the other was aborted? This article aims at explaining this puzzle and finding a solution to address the NIMBY problem that happens all across China today. With thorough comparative case studies, this article argues that a knowledge-based participation initiated by a policy entrepreneur from the public is helpful in addressing this problem.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Cities - Volume 73, March 2018, Pages 63-70
نویسندگان
, ,