کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
771943 | 1462883 | 2014 | 10 صفحه PDF | دانلود رایگان |
• A pilot system was developed for demand management of equipment in buildings.
• The networking was based on LonWorks platform and power line communication.
• Demand strategies led to load reductions up to 74% and energy savings up to 25%.
• The peak load reduction is expected to reach 3.44 GW by the year 2030.
Managing peak demand efficiently is vital for maintaining uninterrupted supply of electrical power by utility providers. In this work, a pilot system was developed for managing and controlling the demand of major power consuming equipment in buildings from a central server, while relying mostly on existing infrastructure and maintaining consumer comfort. The system was successfully demonstrated on a selected group of buildings using the LonWorks networking platform. At the building level, the system utilized power line and twisted pair communication to control the thermostats of air-conditioning (A/C) units. The higher level communication was executed through extensible markup language (XML) and simple object access protocol (SOAP). The system provided control capabilities based on A/C unit priority, thermostat temperature, building type and geographic location. The development and execution of demand management strategies for selected buildings led to peak load reductions up to 74%, in addition to energy savings up to 25%. Implementing such a system at a national level in Kuwait is estimated to reduce peak demand by 3.44 GW, amounting to capital savings of $4.13 billion. The use of existing infrastructure reduced the cost and installation time of the system. Based on the successful testing of this pilot system, a larger-scale system is being developed.
Journal: Energy Conversion and Management - Volume 79, March 2014, Pages 477–486