کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
8066806 1521075 2018 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Estimation of the radiation doses during the dismantling of the equipment in Building 117/1 at the Ignalina NPP
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Estimation of the radiation doses during the dismantling of the equipment in Building 117/1 at the Ignalina NPP
چکیده انگلیسی
The Ignalina NPP was operating two RBMK-1500 reactors which are under decommissioning now. Building 117/1 was the first dismantling project at the Ignalina NPP. The DECRAD computer code was used to plan dismantling and decontamination (D&D) activities in Building 117/1. The D&D activities in Building 117/1 were finished at the end of 2011. In this paper, collective doses, duration of the dismantling activities and other parameters defined during the planning of the D&D activities for Building 117/1 are compared with the real dismantling data and also with updated modelling results.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Annals of Nuclear Energy - Volume 121, November 2018, Pages 29-35
نویسندگان
, , ,