Estimating the response times of human operators working in the main control room of nuclear power plants based on the context of a seismic event - A case study
ترجمه فارسی عنوان
برآورد زمان پاسخ اپراتورهای انسانی که در اتاق کنترل نیروگاه های هسته ای کار می کنند بر اساس زمینه رویداد لرزه ای - مطالعه موردی
کلمات کلیدی
ارزیابی ایمنی احتمالی، تجزیه و تحلیل قابلیت اطمینان انسان، رویداد لرزه ای، زمان پاسخ، برآورد مبتنی بر محتوا،
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
چکیده انگلیسی
After the Fukushima accident, a couple of novel issues have raised in terms of the safety assessment of nuclear power plants (NPPs). This means that the performance of human operators should be properly evaluated under an extreme event. However, it is unrealistic to collect a sufficient amount of human performance data from a real event, such as a great earthquake. As one of the promising solutions, a conceptual framework is suggested in this paper, which is helpful for estimating the response time data of human operators working in the main control room of NPPs under a seismic event. To this end, the four kinds of representative contexts that could be anticipated from seismic events are identified. Then the response times of human operators who are faced with similar contexts are reviewed from existing literatures and databases. As a result, a couple of rules that allow us to extrapolate the response times of human operators under seismic events are extracted. Although underlying rationales being used for determining these rules are still arguable, it is expected that response times under seismic events could be properly understood along with accumulating those of human operators against non-seismic conditions.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Annals of Nuclear Energy - Volume 85, November 2015, Pages 36-46
نویسندگان
, , , , ,