Technical and environmental analysis of repowering the existing CHP system in a petrochemical plant: A case study
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه
مهندسی انرژی
انرژی (عمومی)
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
In this paper the effects of repowering of an existing combined heat and power (CHP) system in a Petrochemical Plant is evaluated. The studied system includes 3 steam generators, 3 turbogenerators to generate 18â¯MW electricity and 3 steam collectors (HPS, MPS and LPS) to provide steam for various steam consumers. According to the low efficiency of the existing boilers, the full repowering method was suggested and analyzed. To do this, three different plans was introduced, using single, double and triple-pressure level HRSGs. A number of gas turbines were tested and finally considering all aspects into account, the model ABB GT8C was selected. Using this GT and a single-pressure level HRSG instead of present boilers result an increase in produced power by 52.8â¯MW (7.6 times bigger than the simple cycle), while the rate of fuel consumption will be 3.2â¯kg/s (1.6 times bigger than the simple cycle). Moreover, the energy, exergy, heat and total efficiencies will reach to %39.44, %37.58, %29.93 and %69.37, respectively. The mentioned efficiencies in simple cycle are %8.2, %7.99, %48.3 and %56.68, respectively. The rate of fuel consumption, CO2 and NOx production will also be 3.2â¯kg/s (1.6 times bigger than the simple cycle), 0.106 and 0.00027â¯kg/kW.h (0.502 and 0.00089â¯kg/kW.h in the simple cycle), respectively.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy - Volume 159, 15 September 2018, Pages 937-949
Journal: Energy - Volume 159, 15 September 2018, Pages 937-949
نویسندگان
Gholamreza Ahmadi, Davood Toghraie, Omid Ali Akbari,