کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
8915384 1641098 2018 27 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Assessment of electrical resistivity imaging for pre-tunneling geological characterization - A case study of the Qingdao R3 metro line tunnel
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات فیزیک زمین (ژئو فیزیک)
پیش نمایش صفحه اول مقاله
Assessment of electrical resistivity imaging for pre-tunneling geological characterization - A case study of the Qingdao R3 metro line tunnel
چکیده انگلیسی
Unlike the traditional cross-hole observation mode, TBERI only use a single borehole. The installation of injection electrodes inside the probe hole and the installation of measuring electrodes on the tunnel face is proposed as the observation mode. Furthermore, a numerical simulation is carried out before the real field experiment, and the simulation results show that the TBERI is capable of detecting a deeply buried water body. In addition, the water body in the field case is also identified by TBERI. The water body appears as a strongly conductive anomaly relative to the background materials. This study highlights the respective strengths and weaknesses of the TBERI for pre-tunneling geological characterization. This method is a relatively rapid means of investigating the studied area. This study clearly demonstrates the suitability of TBERI in a tunneling scenario.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Applied Geophysics - Volume 153, June 2018, Pages 38-46
نویسندگان
, , , , , , , , , , ,