Time of the essence
موضوعات مرتبط
علوم انسانی و اجتماعی اقتصاد، اقتصادسنجی و امور مالی اقتصاد و اقتصادسنجی
پیش نمایش صفحه اول مقاله
Time of the essence
چکیده انگلیسی
In most industries, ranging from information systems development to construction, an overwhelming proportion of projects are delayed beyond estimated completion time. This fact constitutes somewhat of a puzzle for existing theory. The present paper studies project delays and optimal contracts under moral hazard in a setting with time to build. Within this setup, project delays are found to be most likely to happen at early stages of development and intimately connected to the degree of commitment of the procurer and the class of contracts that can be enforced. The first-best, optimal spot contracting and optimal long-term contract scenarios are analyzed, as well as commonly encountered additional constraints on the long-term contract.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Economic Theory - Volume 129, Issue 1, July 2006, Pages 252-272
نویسندگان
,