کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9638315 505055 2005 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Overview of the DIII-D program and construction plans
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Overview of the DIII-D program and construction plans
چکیده انگلیسی
Three additional long pulse gyrotrons have been ordered for the DIII-D program. They are required for current profile control and stabilization of the NTMs. The gyrotrons are scheduled to be installed during a 10-12-month facility enhancement period, which spans 2005-2006. At the same time a modification is scheduled to be made to the lower divertor to make it pump double null high triangularity plasmas, which are important for studying advanced tokamak plasmas. One of the four neutral beam lines will be rotated for counter injection, which will allow study of the quiescent double barrier mode with central co-rotation of the plasma and of the resistive wall mode with low rotation.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 74, Issues 1–4, November 2005, Pages 171-177
نویسندگان
, ,