کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9638326 505055 2005 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Status of the 140 GHz, 10 MW CW transmission system for ECRH on the stellarator W7-X
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Status of the 140 GHz, 10 MW CW transmission system for ECRH on the stellarator W7-X
چکیده انگلیسی
The status of the construction of the transmission lines and the design of the launchers is reported. Low-power tests of a prototype system at IPF Stuttgart are reviewed. Now, the first two gyrotrons are operating at IPP Greifswald, and high-power long-pulse tests have started. Measurements on transmission performance, behaviour of the water-cooled mirrors under thermal and microwave loads as well as alignment issues, characteristics of directional couplers, calorimetric loads, and other diagnostics are discussed.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 74, Issues 1–4, November 2005, Pages 243-248
نویسندگان
, , , , , , , , , , , , , , , , , , ,