کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
9638350 505055 2005 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant
چکیده انگلیسی
The CEA Association is involved, in close collaboration with ENEA, FZK, IPP and UKAEA European Associations, in the first ITER neutral beam (NB) injector and the ITER neutral beam test facility design (EFDA task ref. TW3-THHN-IITF1). A total power of about 50 MW will have to be removed in steady state on the neutral beam test facility (NBTF). The main purpose of this task is to make progress with the detailed design of the first ITER NB injector and to start the conceptual design of the ITER NBTF. The general infrastructure layout of a generic site for the NBTF includes the test facility itself equipped with a dedicated beamline vessel [P.L. Zaccaria, et al., Maintenance schemes for the ITER neutral beam test facility, this conference] and integration studies of associated auxiliaries such as cooling plant, cryoplant and forepumping system.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 74, Issues 1–4, November 2005, Pages 397-402
نویسندگان
, , , , , , , , , , , , , , , , ,