کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
992198 935726 2012 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Institution Building with Limited Resources: Establishing a Supreme Audit Institution in Rwanda
موضوعات مرتبط
علوم انسانی و اجتماعی اقتصاد، اقتصادسنجی و امور مالی اقتصاد و اقتصادسنجی
پیش نمایش صفحه اول مقاله
Institution Building with Limited Resources: Establishing a Supreme Audit Institution in Rwanda
چکیده انگلیسی

SummaryThis study examines the tensions between best-practice institutional benchmarks and local operational constraints in a developing country institution-building process. Drawing on data from document studies and key informant interviews, we investigate if and how staff capacity constraints affect the achievement of the programmatic ideal of supreme audit institution (SAI) independence, and what tradeoffs this gives rise to in the development of a SAI oversight function in Rwanda. The empirical results suggest that capacity constraints negatively affect important aspects of SAI independence, and point to the need for contextual institutional solutions to safeguard independence as well as to tackle capacity constraints.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: World Development - Volume 40, Issue 9, September 2012, Pages 1870–1881
نویسندگان
, ,