کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
10322987 660879 2011 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر هوش مصنوعی
پیش نمایش صفحه اول مقاله
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
چکیده انگلیسی
► Integrated flexible job-shop and preventive maintenance is probed in this study. ► Makespan as an objective for production part and reliability as an objective for maintenance part are optimized simultaneously. ► A mathematic model and a solving method are introduced in this paper and results are compared carefully.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Expert Systems with Applications - Volume 38, Issue 6, June 2011, Pages 7169-7178
نویسندگان
, , ,