کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
11007452 1521941 2018 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Techno-economic analysis of CO2 capture from a 1.2 million MTPA cement plant using AMP-PZ-MEA blend
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات فرآیندهای سطح زمین
پیش نمایش صفحه اول مقاله
Techno-economic analysis of CO2 capture from a 1.2 million MTPA cement plant using AMP-PZ-MEA blend
چکیده انگلیسی
Cash flow analysis showed that without adding a CO2 capture unit to a cement plant, carbon tax increased the cement price up to 22.9%. However, a combination of the high carbon tax, high CO2 sales price, low energy penalty, and high capture efficiency increased the cement price up to 1.2% for the MEA system but reduced the cement price up to 5% for the AMP-PZ-MEA system. This comprehensive study shows that a cost-effective and energy-efficient amine blend, energy penalty, CO2 capture efficiency, carbon tax, and CO2 sales prices are all integral towards reducing the cement price while significantly reducing the CO2 emissions.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Greenhouse Gas Control - Volume 78, November 2018, Pages 400-412
نویسندگان
, , , ,