• Assessment of network constraints in DER (distributed energy resources) planning.
• Linear programming problem to find optimal operation and planning of DER.
• Analysis of profitability of DER including electric and thermal generation and storage.
• DC load flow analysis is used to evaluate power line violations in different networks.
Many efforts are being devoted towards achieving optimal planning and operation of DER (Distributed Energy Resources). However, during the planning process, not all relevant thermal constraints of the distribution network are considered; some works claim that they must be taken into account, while others follow the single-node approach.This paper assesses the effects of the distribution network thermal constraints in DER planning, using a deterministic linear programming problem to find the optimal DER planning and operation. Three case studies with different network topologies under several DER implementation scenarios are analyzed. A DC load flow is used to estimate the required network reinforcements to accommodate optimal DER investments, if any. Reinforcement costs are then calculated to assess the net benefit compared to limiting DER investments and operation, according to the network thermal limits. Results suggest that there is no significant economic advantage in limiting DER investments and line flows, compared to reinforcing the low voltage network to allow the larger flows that result from an unconstrained network problem.
Journal: Energy - Volume 84, 1 May 2015, Pages 783–793