Second law analysis of wind turbine power plants: Cesme, Izmir example
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Second law analysis of wind turbine power plants: Cesme, Izmir example
چکیده انگلیسی

In this study, the energy and exergy efficiency results of the Wind Turbine Power Plants (WTPPs) are presented. Exergy, energy and technical availability analysis are performed. The case study includes the actual system data taken from the system in Cesme, Izmir WTPP. General energy, exergy and other performance parameters are also presented. Investigated WTPP is Turkey’s first installed (1998) wind plant (1.50 MW) located in Izmir. Exergy efficiency of the power plant found to be between 0% and 68.20%. The monthly average technical availabilities are 96.11%, 98.71%, 98.52% for turbine 1, turbine 2, and turbine 3, respectively. Furthermore, authors developed some correlations, which are capable of predicting the values of exergy efficiencies of the WTPP for different power factor value.


► In this study, the energy and exergy efficiency results of the Wind Turbine Power Plants (WTPPs) are presented.
► Exergy, energy and technical availability analysis are performed.
► The case study includes the actual system data taken from the system in Cesme, Izmir WTPP.
► Authors developed some correlations, which are capable of predicting the values of exergy efficiencies of the WTPP for different power factor value.
► The results of the paper, particularly on locations and types of the losses, will help the researchers, government administration, and engineers and operators working in the area of wind energy systems develop and adapt appropriate measures and policies.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy - Volume 36, Issue 5, May 2011, Pages 2535–2542
نویسندگان
, , ,