کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1735264 1016176 2010 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Evaluation and analysis of a proxy indicator for the estimation of gate-to-gate energy consumption in the early process design phases: The case of organic solvent production
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Evaluation and analysis of a proxy indicator for the estimation of gate-to-gate energy consumption in the early process design phases: The case of organic solvent production
چکیده انگلیسی

Gate-to-gate process energy consumption is an important metric for sustainability as it affects both costs and environmental impact. As only little process information is available in early phases of chemical process design, a detailed energy consumption calculation is substantially restrained. Therefore, a reliable estimation of energy consumption in early phases of process design is an important alternative. In this work, an index representing process energy consumption was evaluated and tested for 14 organic solvent case studies. By using simplified process models the indices were calculated and compared to literature values for gate-to-gate energy consumption. The predictability of the process energy consumption on the basis of this indicator, including possible modifications in its original definition, was evaluated with the Pearson's and Spearman's correlation coefficients. The results further validated the use of the EI (energy index) in its original form as a proxy indicator of the process energy consumption for decision making in early stages of process design. For assessing the production of new classes of chemicals the EI should be evaluated as shown in this paper in order to establish its practicability. In certain cases an adjustment of the indicator categories may be necessary.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy - Volume 35, Issue 6, June 2010, Pages 2407–2418
نویسندگان
, , , , ,