کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1736173 | 1016207 | 2006 | 11 صفحه PDF | دانلود رایگان |
This paper studies how to improve the capacity of the combined cycle (CC) power plant which has been operated for 8 years. The most popular way is to lower intake air temperature to around 15 °C (ISO) and 100% RH before entering the air compressor of a gas turbine (GT). Thailand has 3 seasons: winter, summer and rainy season. According to 2003 Bangkok monthly weather data, all year ambient temperature is higher than 15 °C. This research proposes a steam absorption chiller (AC) to cool intake air to the desired temperature level. It could increase the power output of a GT by about 10.6% and the CC power plant by around 6.24% annually. In economic analysis, the payback period will be about 3.81 years, internal rate of return 40%, and net present value 19.44 MUS$.
Journal: Energy - Volume 31, Issue 12, September 2006, Pages 2036–2046