کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1755079 | 1522830 | 2013 | 7 صفحه PDF | دانلود رایگان |

• The graded proppant injection stimulates CBM wells.
• It stimulates any natural fracture system.
• The presented mathematical models predicts well productivity enhancement.
• The modelling minimizes the hydraulic resistance due to proppant plugging in cleats.
• The model allows calculation of an optimal proppant injection schedule.
Graded proppant injection i.e. the injection of particles of increasing size and decreasing concentration, is proposed as a method for stimulating natural fractures. Compared to the injection of mono-sized proppant, graded proppant injection would facilitate deeper percolation of proppant into the fracture system and enhanced well productivity.A mathematical model is developed which describes the injection stage and the capture kinetics of proppant particles in the natural fracture system. Based on the mathematical model, an injection schedule is developed which would result in the optimal placement of proppant in the fracture system. A case study is conducted to estimate the change in well productivity index due to the application of the graded particle injection method.
Journal: Journal of Petroleum Science and Engineering - Volume 111, November 2013, Pages 71–77