کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
242283 501817 2007 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Incremental development of CBR strategies for computing project cost probabilities
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر هوش مصنوعی
پیش نمایش صفحه اول مقاله
Incremental development of CBR strategies for computing project cost probabilities
چکیده انگلیسی

This paper presents three CBR systems that have been developed over seven years in collaboration with two industrial partners. In this research, case based reasoning (CBR) is used to compute costs of construction projects. In contrast with previous work in the field of CBR, the focus is on choosing strategies that are compatible with user needs and characteristics. Comparing the three strategies reveals advantages and drawbacks while illustrating a “real-life” evolution of a CBR architecture in an industrial context. An important conclusion is that the ways users perform tasks have a direct influence on the best architecture for the CBR system (e.g. transformational/derivational analogy). Incremental development of strategies in the final system improves user interaction, expedites time consuming tasks and favours identification of synergy between techniques such as CBR and data mining.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Advanced Engineering Informatics - Volume 21, Issue 3, July 2007, Pages 311–321
نویسندگان
, , , ,