کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
271727 505006 2013 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Progress of ITER vacuum vessel
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Progress of ITER vacuum vessel
چکیده انگلیسی

Design modifications were implemented in the vacuum vessel (VV) baseline design in 2011–2012 for finalization. The modifications are mostly due to interface components, such as support rails and feedthroughs for the in-vessel coils (IVC). Manufacturing designs are being developed at the domestic agencies (DAs) based on the baseline design. The VV support design was also finalized and tests on scale mock-ups are under preparation. Design of the in-wall shielding (IWS) has progressed, considering the assembly methods and the required tolerances. Further modifications are required to be consistent with the DAs’ manufacturing designs. Dynamic tests on the inter-modular and stub keys to support the blanket modules are being performed to measure the dynamic amplification factor (DAF). An in-service inspection (ISI) plan has been developed and R&D was launched for ISI. Conceptual design of the VV instrumentation has been developed. The VV baseline design was approved by the agreed notified body (ANB) in accordance with the French Nuclear Pressure Equipment Order procedure.


► This covers the overall status and progress of the ITER vacuum vessel activities.
► It includes design, R&D, manufacturing and approval process of the regulators.
► The baseline design was completed and now manufacturing designs are on-going.
► R&D includes ISI, dynamic test of keys and lip-seal welding/cutting technology.
► The VV suppliers produced full-scale mock-ups and started VV manufacturing.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 88, Issues 6–8, October 2013, Pages 590–596
نویسندگان
, , , , , , , , , , , , , , , , , , , , ,