Risk mitigation strategy for the ITER electron cyclotron upper port launcher
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Risk mitigation strategy for the ITER electron cyclotron upper port launcher
چکیده انگلیسی

A basic requirement for ITER equipment to meet is a high level of reliability, because ITER operation time is precious and radioactive operation leaves limited scope for repair. In order to reduce the risk of failure during ITER operation an effective risk mitigation strategy is necessary. This paper presents such strategy for the ITER electron cyclotron upper port launcher (ECUPL).A preliminary ECUPL risk analysis identifies possible failure modes. A probabilistic risk assessment quantifies the risk of failure using a 4 × 4 impact-likelihood matrix. Impact is quantified through technical, cost and schedule elements. Likelihood depends on the risk mitigation strategy adopted. A cost benefit analysis determines the most cost effective risk mitigation strategy.An essential element in risk mitigation is the testing of equipment prior to installation on the ITER machine. This paper argues the need for low- and highpower millimetre wave tests carried out on the fully assembled ECUPL. It presents a conceptual design for a dedicated on-site test bed that can handle 2 of 8 microwave beams at 2 MW long pulse operation.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volume 85, Issues 7–9, December 2010, Pages 1117–1124
نویسندگان
, , , , ,