کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
274779 505373 2014 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Viaducto de Trapagaran
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Viaducto de Trapagaran
چکیده انگلیسی
The Trapagaran viaduct was divided into three parts: main viaduct, access viaduct and transition area. The main viaduct is 670 m long with 125 m spans. It is formed by a 35.60 m wide, 5.90 m deep prestressed concrete box cross section. The access viaduct is formed by four separate structures with spans reaching 86 m. Each of the decks is made up of a composite 3.50 m deep box girder. The four branches converge in the transition area displaying complex geometry. The transition area is a prestressed concrete structure of approximately 60 m in span executed on falsework.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Hormigón y Acero - Volume 65, Issue 274, October–December 2014, Pages 233-245
نویسندگان
, , ,