کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4428239 1619284 2015 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Ecological risk assessment of acid rock drainage under uncertainty: The fugacity approach
موضوعات مرتبط
علوم زیستی و بیوفناوری علوم محیط زیست شیمی زیست محیطی
پیش نمایش صفحه اول مقاله
Ecological risk assessment of acid rock drainage under uncertainty: The fugacity approach
چکیده انگلیسی


• A methodology for ARD risk assessment during a pre-mining stage was developed.
• A model that accounts uncertainties was developed to simulate metals at mine sites.
• Uncertainty in effect characterization was estimated based on probability bounds.
• Risk characterization methods using p-boxes was presented.
• The methodology demonstrated at a mine site where data are limited.

Acid rock drainage (ARD) is a major environmental problem that poses serious ecological risks during and after mining activities. To minimize the ecological risks and to lower remediation costs in the mining industry, ecological risk assessment is highly important in various phases of mining. In this study, a methodology for ecological risk assessment using probability bounds is presented. The methodology is demonstrated with a case study at a mine site. A fugacity-based model was employed to conduct the exposure characterization. Median lethal concentrations from toxicity studies were used to derive predicted no-effect concentrations (PNEC) and to characterize the effect of copper and zinc on the receptors. Probabilistic risk-quotient and overlaps between distributions of exposure and effect were employed to characterize risk. Data and parameter uncertainties in exposure, effect, and risk characterizations were propagated and quantified using a probability bounds approach. The exposure modeling results showed that the predicted concentrations of copper and zinc slightly exceeded the observed concentrations. The results of the effect characterization showed that the derived effect concentrations for copper and zinc are acceptable compared with guideline values. The risk characterization result indicated that a high probability of ecological risk may exist due to metals that are transported into a nearby lake. Moreover, the results showed that the methodology handles uncertainties due to imprecision and randomness in an integrated manner.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Environmental Technology & Innovation - Volume 4, October 2015, Pages 240–247
نویسندگان
, , , ,