کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4921875 1429521 2017 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs
موضوعات مرتبط
مهندسی و علوم پایه علوم زمین و سیارات زمین شناسی اقتصادی
پیش نمایش صفحه اول مقاله
NPV risk simulation of an open pit gold mine project under the O'Hara cost model by using GAs
چکیده انگلیسی

This paper analyzes an open pit gold mine project based on the O'Hara cost model. Hypothetical data is proposed based on different authors that have studied open pit gold projects, and variations are proposed according to the probability distributions associated to key variables affecting the NPV, like production level, ore grade, price of ore, and others, so as to see what if, in a gold open pit mine project of 3000 metric tons per day of ore. Two case scenarios were analyzed to simulate the NPV, one where there is low certainty data available, and the other where the information available is of high certainty. Results based on genetic algorithm metaheuristic simulations, which combine basically Montecarlo simulations provided by the Palisade Risk software, the O'Hara cost model, net smelter return and financial analysis tools offered by Excel are reported, in order to determine to which variables of the project is more sensitive the NPV.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Mining Science and Technology - Volume 27, Issue 3, May 2017, Pages 557-565
نویسندگان
, , ,