کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4997662 1459917 2017 20 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Simultaneous nitrification/denitrification and stable sludge/water separation achieved in a conventional activated sludge process with severe filamentous bulking
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی تکنولوژی و شیمی فرآیندی
پیش نمایش صفحه اول مقاله
Simultaneous nitrification/denitrification and stable sludge/water separation achieved in a conventional activated sludge process with severe filamentous bulking
چکیده انگلیسی
This study investigated the long-term treatment performance of a conventional activated sludge (AS) process operating at a microaerobic DO level (0.5-1.0 mg·L−1) in the aeration tank and a long settling time of >10 h in the clarification tank for sewage treatment. The microaerobic DO conditions led to severe sludge bulking. However, good sludge/water separation and excellent pollutant removal performance (COD, 95 ± 2%; NH4+-N, 99 ± 1%; and TN, 69 ± 6%) were stably achieved in the microaerobic AS system during its 150 days of continuous operation. This is the first report to demonstrate that a long settling time effectively overcame the effect of severe filamentous bulking in conventional AS process, and that microaerobic DO conditions achieved excellent simultaneous nitrification and denitrification reactions in the aeration tank. The process characteristics of the microaerobic AS system differed substantially from those existing biological denitrification processes, including A/O, CANON, and OLAND processes.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Bioresource Technology - Volume 226, February 2017, Pages 267-271
نویسندگان
, , , , ,