کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5105587 1481248 2017 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A comprehensive ex-post assessment of RES deployment in Italy: Jobs, value added and import leakages
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
A comprehensive ex-post assessment of RES deployment in Italy: Jobs, value added and import leakages
چکیده انگلیسی
Although during the period under consideration Italy experienced an expansion in RES capacity that went beyond the rosiest expectations, it appears that the resulting demand for plant components was met to a very significant extent by imports. We find that the contribution to sectoral value added and employment was not as large as envisioned by ex-ante analyses. In net terms, the resources absorbed by RES plants in the construction, installation and manufacturing phase seem to have made a smaller contribution to the domestic economy than they would have in several counterfactual scenarios. The opposite is true for the resources used in the subsequent operation and management phase. Finally, our results suggest that variation in domestic content of manufactured products may limit the portability of RES employment and value added factor estimates across countries.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Policy - Volume 110, November 2017, Pages 234-245
نویسندگان
, , , ,