• Safety regulations were identified in all phases of turnaround maintenance projects.
• Safety criteria needed in contractors prequalification were identified for turnaround maintenance projects.
• Safety criteria were used in contractors' selection for turnaround maintenance projects.
• Contractors' selection based on safety criteria will enhance the safety levels during project's implementation.
• A case study of contractors' selection in turnaround projects was shown at a process plant in Saudi Arabia.
Turnaround maintenance (TAM) is a usual plant shutdown that is done by process industries to perform asset inspections, repairs, and overhauls. TAM engineering projects are needed on a periodic basis to optimize a plant's performance. Process industrial plants usually don't have enough in-house manpower to carry out needed TAM jobs; it is not uncommon for a process industrial plant to outsource its TAM manpower supply to external contractors. This will create a peculiar management challenge regarding how to assure orientation of safety practices for the newly hired labor. Although accidents during process plant shutdowns may have severe consequences, the safety management systems in place for many companies only cover normal operations and few explicitly address TAM projects. Usually, contractors are evaluated from a safety perspective after handling the project by monitoring safety indicators such as number of injuries, incidents, etc. This paper emphasizes safety attributes to be included in selecting contractors at the bidding stage to assure loss prevention and better safety orientation during TAM implementation. The paper starts with reviewing TAM literature and defining main needed safety attributes to prequalify contractors. It develops an analytic hierarchy process (AHP) model that is applied to rank TAM contractors' selection. A case study is presented for a petrochemical plant in Saudi Arabia to demonstrate the AHP model.
Journal: Journal of Loss Prevention in the Process Industries - Volume 34, March 2015, Pages 115–126