کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
623334 | 1455338 | 2015 | 8 صفحه PDF | دانلود رایگان |
• Life cycle assessment of the SWRO desalination plant with beach well intake
• Life cycle assessment of the SWRO desalination plant with an open intake
• Plant with beach well intake results in up to 31% less environmental impact.
• Plant with beach well intake results in 13% lower total costs.
This paper presents a comparative life cycle assessment (LCA) and levelised cost (LC) analysis of two scenarios: an open intake scenario in which a seawater reverse osmosis (SWRO) desalination plant employs an open intake and membrane pre-treatment prior to RO, and a beach well scenario in which feedwater is extracted from the subsurface using beach well intake and cartridge filtration prior to RO. In both scenarios, desalination plants with 35,000 m3/day capacities were modelled. Results indicate that the beach well intake plant life cycle environmental burdens and LC were as much as 31% and 13% lower respectively, compared with the open intake plant. A detailed contribution analysis revealed that the better environmental performance of the beach well intake plant was significantly influenced by its comparatively low electricity use in the simplified pre-treatment process. The better economic performance of the plant with beach well intake was mostly due to savings in chemical use. The results are based on site specific assumptions. However, the LCA and LC framework developed herein could be used to determine the optimum SWRO seawater intake and pre-treatment configuration at plant sites with different characteristics to those modelled herein, provided sufficient data is available.
Journal: Desalination - Volume 357, 2 February 2015, Pages 259–266