کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
6745654 504980 2015 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
MAST Upgrade - Construction Status
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
MAST Upgrade - Construction Status
چکیده انگلیسی
With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Fusion Engineering and Design - Volumes 96–97, October 2015, Pages 42-47
نویسندگان
, , , , , , , , , , ,